We are requesting reimbursement for roof loading under Xactimate line item RFG LOAD.
Roof loading is not provided by roofing manufacturers or material suppliers and must be performed manually by the roofing contractor before installation can begin. This labor is necessary to safely distribute roofing materials across a steep, two-story roof.
Our roof loading calculation is as follows:
- Field shingles: 168 bundles
- Starter shingles: 5 bundles
- Hip & Ridge shingles: 12 bundles
- Total bundles: 185
185 bundles × 4 minutes per bundle = 740 minutes
740 minutes ÷ 60 = 12.33 labor hours
12.33 labor hours × $128.00/hour = $1,578.24
If needed, we can also provide a letter from our supplier confirming that roof loading is not performed by the manufacturer or material supplier and must be completed by the installing contractor.